Before completing consider:
• In case of needing additional energy, the Fair will determine the feasibility of installing the requested energy.
• The minimum additional energy to request is 1 kW. The additional energy to be requested CANNOT be divided, for example: 1.5 kW, 2.5 kW, etc.
• Additional energy about 3 Kw. will be delivered three-phase in an industrial connector
• If they require additional single-phase power over 3 KW. It is delivered unified with the base power in a three-phase board with an industrial connector.
• The installation consists of a connection point and a thermomagnetic protection on the stand. These elements are the property of the Fair, which will be removed once the event is over.
• The distribution of the electrical installation within the stand is the responsibility of the exhibitor, who must present to the Technical Department of FISA SA (email:proyectos@feriaexpovivienda.cl) a plan of his electrical project, carried out by a qualified professional.
• Subsequently, this department will review and approve it.
• The additional energy is delivered 12 hours before the inauguration
•Requests for additional services after September 12, values carry a 20% surcharge
IMPORTANT: Requests must be made before September 12, after this date the technical feasibility will be reviewed