Before completing consider:
– In case of needing additional energy, the Fair will determine the feasibility of installing the requested energy. – The minimum amount of additional energy to be requested is 1 kw. The additional energy to be requested CANNOT be fractioned, for example: 1.5 kw, 2.5 kw, etc. • Additional energy about 3 Kw. will be delivered three-phase in an industrial connector – If additional single-phase power over 3 KW is required. Delivered unified with the base power in three-phase board with an industrial connector – The installation consists of a connection point and a thermo-magnetic protection on the stand. These elements are the property of the Fair, which will be removed once the event is over. • The distribution of the electrical installation within the stand is the responsibility of the exhibitor, who must present to the Technical Department of FISA SA (email:proyectos@feriaexpovivienda.cl) a plan of his electrical project, carried out by a qualified professional. • Subsequently, this department will review and approve it. – Additional energy is delivered 12 hours before the inauguration -Requests for additional services after August 12 are subject to a 20% surchargeIMPORTANT: Requests must be made before August 12, after this date technical feasibility will be reviewed.
Reviews
There are no reviews yet.