Before completing consider:
– In case of needing additional energy, the Fair will determine the feasibility of installing the requested energy. – The minimum amount of additional energy to be requested is 1 kw. The additional energy to be requested CANNOT be fractioned, for example: 1.5 kw, 2.5 kw, etc. • Additional energy over 7 Kw. will be delivered three-phase in an industrial connector – If they require additional single-phase power over 7 KW. Delivered unified with the base power in three-phase board with an industrial connector – The installation consists of a connection point and a thermo-magnetic protection on the stand. These elements are the property of the Fair, which will be removed once the event is over. – The exhibitor is responsible for the distribution of the electrical installation inside the stand, and must submit to FISA S.A.’s Technical Department (email: mrebolledo@fisa.cl) a plan of the electrical project, drawn up by a qualified professional. • Subsequently, this department will review and approve it. – Additional energy is delivered 12 hours before the inauguration -Requests for additional services after October 27th are subject to a 20% surchargeIMPORTANT: Requests must be made before October 27th, after this date technical feasibility will be reviewed.
Reviews
There are no reviews yet.